IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0370 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $6,750 Not Implemented
LE0370 # 10 Y:2014 10 2014 REPLACE BOILER $61,996 $205,000 Not Implemented
LE0337 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,562 Not Implemented
LE0337 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $11,678 $19,140 Not Implemented
LE0337 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,684 $1,000 Not Implemented
LE0337 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,631 $28,000 Not Implemented
LE0337 # 05 Y:2012 05 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,107 $2,500 Not Implemented
LE0333 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,424 $1,000 Not Implemented
LE0333 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,510 $7,490 Not Implemented
LE0333 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $12,800 Not Implemented
LE0333 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,111 $14,190 Not Implemented
LE0333 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,865 $1,000 Not Implemented
LE0333 # 06 Y:2012 06 2012 REDUCE HEAT GAIN BY WINDOW TINTING $4,369 $0 Not Implemented
LE0333 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,573 $950 Not Implemented
LE0333 # 08 Y:2012 08 2012 REDESIGN PROCESS $513 $5,280 Not Implemented
DL0034 # 08 Y:2009 08 2009 ADD AREA LIGHTING SWITCHES $313 $197 Implemented
DL0034 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $700 $0 Implemented
DL0034 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,735 $18,313 Implemented
DL0034 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $4,000 Implemented
DL0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,489 $55,984 Implemented
DL0034 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,700 $4,440 Not Implemented
DL0034 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,702 $5,000 Not Implemented
DL0034 # 01 Y:2009 01 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,400 $3,600 Not Implemented