Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,058
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0494 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,724 | $158 | Implemented |
WV0494 # 05 Y:2014 | 05 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,708 | $6,552 | Implemented |
WV0494 # 06 Y:2014 | 06 | 2014 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,149 | $96 | Implemented |
WV0494 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $511 | $1,289 | Implemented |
WV0494 # 08 Y:2014 | 08 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $473 | $438 | Implemented |
WV0494 # 09 Y:2014 | 09 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $414 | $235 | Not Implemented |
WV0494 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $371 | $1,411 | Implemented |
WV0486 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,561 | $100,000 | Not Implemented |
WV0486 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,397 | $51,976 | Implemented |
WV0486 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,550 | $688 | Implemented |
WV0486 # 04 Y:2014 | 04 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,358 | $1,000 | Implemented |
WV0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $846 | $3,700 | Not Implemented |
WV0486 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $558 | $75 | Implemented |
WV0486 # 07 Y:2014 | 07 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $262 | $519 | Implemented |
LE0370 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $3,349 | $0 | Implemented |
LE0370 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $35 | Implemented |
LE0370 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,490 | $200 | Implemented |
LE0370 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $1,000 | Implemented |
LE0370 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,981 | $2,653 | Implemented |
LE0370 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,997 | $4,187 | Not Implemented |
LE0370 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,755 | $1,688 | Not Implemented |
LE0370 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,133 | $15,100 | Not Implemented |
LE0370 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,137 | $6,750 | Not Implemented |
LE0370 # 10 Y:2014 | 10 | 2014 | REPLACE BOILER | $61,996 | $205,000 | Not Implemented |
LE0370 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,070 | $75,880 | Not Implemented |