Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
342
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0375 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,447 | $22,100 | n/a |
MZ0375 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $295 | $2,100 | n/a |
MZ0375 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,208 | $400 | n/a |
MZ0375 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,746 | $214,502 | n/a |
MZ0375 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $1,090 | $1,405 | n/a |
MZ0375 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,865 | $0 | n/a |
MZ0375 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,542 | $13,100 | n/a |
MZ0375 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,435 | $12,750 | n/a |
MZ0375 # 09 Y:2025 | 09 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $394,334 | $2,410,000 | n/a |
UW2504 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,637 | $15,000 | n/a |
UW2504 # 05 Y:2025 | 05 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,594 | $149,864 | n/a |
UW2504 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $24,319 | $2,741 | n/a |
UW2504 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,995 | $262,084 | n/a |
UW2504 # 04 Y:2025 | 04 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,531 | $210,600 | n/a |
UW2504 # 06 Y:2025 | 06 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $32,988 | $55,500 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |