IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
Reset
NAICS 332311 Prefabricated Metal Building and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0013 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,825 $22,200 Not Implemented
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented
BS0013 # 06 Y:2013 06 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,270 $360 Not Implemented
NC0404 # 01 Y:2010 01 2010 INSTALL TIMERS AND/OR THERMOSTATS $4,526 $6,090 Implemented
NC0404 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $200 Implemented
NC0404 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $435 $1,890 Implemented
NC0404 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,935 $40 Not Implemented
SF0379 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,329 $0 Implemented
SF0379 # 02 Y:2009 02 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $909 $0 Implemented
SF0379 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $1,566 Not Implemented
SF0379 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $8,945 $5,833 Implemented
SF0379 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $3,347 $4,920 Implemented
SF0379 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $1,288 Implemented
SF0379 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,419 $28,144 Implemented
OR0542 # 01 Y:2008 01 2008 Solar $112,205 $783,772 Not Implemented
OR0542 # 02 Y:2008 02 2008 Painting Operations $31,122 $1,120 Not Implemented
OR0542 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,350 $385 Not Implemented
OR0542 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,260 $6,902 Not Implemented
OR0542 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $9,045 Not Implemented
OR0542 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,527 $0 Not Implemented
AM0548 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100,400 $59,650 Implemented
AM0548 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $12,300 $17,275 Not Implemented
AM0548 # 03 Y:2008 03 2008 INSTALL SKYLIGHTS $8,620 $17,170 Implemented
AM0548 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,000 $350 Implemented
AM0548 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented