Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
676
matching recommendationsNAICS | 332312 | Fabricated Structural Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0324 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,846 | $500 | n/a |
TT0324 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,944 | $82,992 | n/a |
TT0324 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,929 | $13,000 | n/a |
TT0324 # 01 Y:2025 | 01 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $160,334 | $75,000 | n/a |
TT0324 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,316 | $1,305 | n/a |
TT0324 # 02 Y:2025 | 02 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $83,556 | $0 | n/a |
TT0324 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $29,835 | $24,750 | n/a |
TT0324 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,732 | $35,000 | n/a |
TT0324 # 09 Y:2025 | 09 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,799 | $60 | n/a |
NT0035 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $7,352 | $5,000 | n/a |
NT0035 # 03 Y:2025 | 03 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,000 | $5,300 | n/a |
NT0035 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,196 | $5,609 | n/a |
NT0035 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $0 | n/a |
NT0035 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $150,000 | $38,900 | n/a |
AM0927 # 02 Y:2024 | 02 | 2024 | REDESIGN PROCESS | $7,085 | $34,585 | n/a |
AM0927 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $295 | $166 | n/a |
AM0927 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $166 | n/a |
AM0927 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $86,006 | $120,000 | n/a |
AM0927 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,300 | $8,620 | n/a |
SU0555 # 15 Y:2024 | 15 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $219,132 | n/a |
SU0555 # 14 Y:2024 | 14 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,140 | $35,125 | n/a |
SU0555 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,650 | $115 | n/a |
SU0555 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $600 | $292 | n/a |
SU0555 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $362 | $128 | n/a |
SU0555 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $603 | $344 | n/a |