IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0928 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $153,677 $48,000 Not Implemented
UD0928 # 12 Y:2015 12 2015 ADJUST PH FOR NEUTRALIZATION $68,888 $34,000 Not Implemented
UD0928 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,007 $1,000 Not Implemented
UD0928 # 10 Y:2015 10 2015 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,622 $25,000 Not Implemented
UD0928 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $12,264 $30,000 Not Implemented
UD0928 # 08 Y:2015 08 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,986 $18,300 Not Implemented
UD0928 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $154,780 $150,000 Not Implemented
UD0928 # 06 Y:2015 06 2015 COVER OPEN TANKS $2,876 $2,196 Not Implemented
UD0928 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,184 $105,000 Not Implemented
UD0928 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,735 $12,995 Not Implemented
UD0928 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314,492 $152,750 Not Implemented
UD0928 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,389 $0 Not Implemented
WV0494 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,985 $5,400 Not Implemented
WV0494 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,532 $51,000 Implemented
WV0494 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,592 $1,010 Implemented
WV0494 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,724 $158 Implemented
WV0494 # 05 Y:2014 05 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,708 $6,552 Implemented
WV0494 # 06 Y:2014 06 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,149 $96 Implemented
WV0494 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $1,289 Implemented
WV0494 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $473 $438 Implemented
WV0494 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $414 $235 Not Implemented
WV0494 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $371 $1,411 Implemented