IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0626 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,300 $19,670 Implemented
AM0626 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,990 $350 Implemented
AM0626 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $975 $15 Implemented
AM0626 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $285 $0 Implemented
AM0626 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $250 $15 Implemented
AM0626 # 07 Y:2012 07 2012 INSTALL SKYLIGHTS $3,330 $10,400 Not Implemented
AM0626 # 08 Y:2012 08 2012 INSTALL SKYLIGHTS $1,300 $3,170 Not Implemented
AM0626 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $520 $1,410 Not Implemented
AM0626 # 01 Y:2012 01 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,800 $600 Not Implemented
LE0337 # 05 Y:2012 05 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,107 $2,500 Not Implemented
LE0337 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,562 Not Implemented
LE0337 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $11,678 $19,140 Not Implemented
LE0337 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,684 $1,000 Not Implemented
LE0337 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,631 $28,000 Not Implemented
LE0333 # 06 Y:2012 06 2012 REDUCE HEAT GAIN BY WINDOW TINTING $4,369 $0 Not Implemented
LE0333 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,573 $950 Not Implemented
LE0333 # 08 Y:2012 08 2012 REDESIGN PROCESS $513 $5,280 Not Implemented
LE0333 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,865 $1,000 Not Implemented
LE0333 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,111 $14,190 Not Implemented
LE0333 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,424 $1,000 Not Implemented
LE0333 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $12,800 Not Implemented
LE0333 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,510 $7,490 Not Implemented