Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsNAICS | 332312 | Fabricated Structural Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0375 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,435 | $12,750 | n/a |
MZ0375 # 09 Y:2025 | 09 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $394,334 | $2,410,000 | n/a |
MZ0375 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,746 | $214,502 | n/a |
MZ0375 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,447 | $22,100 | n/a |
MZ0375 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $295 | $2,100 | n/a |
MZ0375 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,865 | $0 | n/a |
MZ0375 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,208 | $400 | n/a |
MZ0375 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,542 | $13,100 | n/a |
MZ0375 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $1,090 | $1,405 | n/a |
UW2504 # 04 Y:2025 | 04 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,531 | $210,600 | n/a |
UW2504 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,637 | $15,000 | n/a |
UW2504 # 05 Y:2025 | 05 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,594 | $149,864 | n/a |
UW2504 # 06 Y:2025 | 06 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $32,988 | $55,500 | n/a |
UW2504 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $24,319 | $2,741 | n/a |
UW2504 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,995 | $262,084 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |