Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,179
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1117 # 03 Y:2025 | 03 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,839 | $947 | n/a |
UD1117 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,029 | $4,975 | n/a |
UD1117 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $0 | n/a |
UD1117 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,183 | $15,550 | n/a |
UD1117 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,656 | $1,015 | n/a |
UD1117 # 05 Y:2025 | 05 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,113 | $0 | n/a |
WV0688 # 10 Y:2025 | 10 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,229 | $5,827 | n/a |
WV0688 # 12 Y:2025 | 12 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $203 | $673 | n/a |
WV0688 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $9,267 | $13,716 | n/a |
WV0688 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,599 | $24,000 | n/a |
WV0688 # 08 Y:2025 | 08 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,612 | $1,500 | n/a |
WV0688 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,295 | $24,800 | n/a |
WV0688 # 11 Y:2025 | 11 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $245 | $70 | n/a |
WV0688 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,242 | $743 | n/a |
WV0688 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,123 | $9,580 | n/a |
WV0688 # 06 Y:2025 | 06 | 2025 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,913 | $21,336 | n/a |
WV0688 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $5,215 | $5,557 | n/a |
WV0688 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,391 | $10,040 | n/a |
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
MU0066 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,303 | $4,440 | n/a |