IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0622 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $6,341 Implemented
SD0622 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,372 $8,800 Not Implemented
SD0622 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,032 $0 Not Implemented
SD0616 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,932 $1,479 Implemented
SD0616 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,172 $0 Not Implemented
SD0616 # 03 Y:2021 03 2021 INSTALL SKYLIGHTS $1,875 $5,370 Not Implemented
SD0616 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,168 $7,800 Implemented
SD0610 # 01 Y:2021 01 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,223 $1,000 Not Implemented
SD0610 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,425 $14,300 Implemented
SD0610 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,043 $3,772 Implemented
SD0610 # 04 Y:2021 04 2021 UPGRADE OBSOLETE EQUIPMENT $343 $0 Not Implemented
SF0571 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $21,900 $0 Not Implemented
SF0571 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,676 $0 Implemented
SF0571 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $62 Not Implemented
SF0571 # 04 Y:2021 04 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,159 $6,120 Not Implemented
SF0571 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,182 $2,146 Implemented
SF0571 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,069 $64,391 Implemented
SF0571 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,241 $10,932 Implemented
SD0600 # 01 Y:2020 01 2020 REDUCE SCRAP PRODUCTION $80,293 $41,423 Not Implemented
SD0600 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,211 $2,620 Implemented
SD0600 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $869 $450 Implemented
SD0600 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $520 Not Implemented
SD0596 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,809 $30,150 Not Implemented
SD0596 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,628 $300 Not Implemented
SD0596 # 03 Y:2020 03 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,037 $2,560 Not Implemented