IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,123

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0556 # 10 Y:2009 10 2009 USE SYNTHETIC LUBRICANT $1,405 $0 Not Implemented
AM0556 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105 $82 Not Implemented
MI0174 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $214,998 $360,000 Not Implemented
MI0174 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,694 $2,000 Implemented
MI0174 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,544 $40 Implemented
MI0174 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,041 $1,210 Implemented
MI0174 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,087 $13,200 Not Implemented
MI0174 # 06 Y:2008 06 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,075 $322 Implemented
OK0768 # 01 Y:2008 01 2008 USE PHOTOCELL CONTROLS $959 $398 Not Implemented
OK0768 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $4,452 Not Implemented
OK0768 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,704 $17,980 Implemented
OK0768 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $208 $1,615 Not Implemented
OK0768 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $2,703 Not Implemented
OK0768 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,145 $16,980 Not Implemented
OK0768 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $2,027 Not Implemented
OK0768 # 08 Y:2008 08 2008 REPLACE TREATED WATER WITH WELL / SURFACE WATER $12,550 $152,330 Not Implemented
OK0768 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,400 $7,484 Not Implemented
OK0768 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,626 $749 Not Implemented
OK0768 # 11 Y:2008 11 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $16,897 $1,517 Not Implemented
OK0768 # 12 Y:2008 12 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,034 $129,640 Implemented
OK0768 # 13 Y:2008 13 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,952 $64,800 Implemented
OK0768 # 14 Y:2008 14 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,760 $7,525 Implemented
OK0768 # 15 Y:2008 15 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $131,460 $41,080 Implemented
OK0768 # 16 Y:2008 16 2008 RECOVER WASTE HEAT FROM EQUIPMENT $23,790 $36,060 Not Implemented
OK0768 # 17 Y:2008 17 2008 TREAT AND REUSE RINSE WATERS $139,194 $135,000 Not Implemented