IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,123

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0642 # 01 Y:2023 01 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,793 $2,300 Not Implemented
SD0642 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,958 $14,573 Not Implemented
SD0642 # 03 Y:2023 03 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $14,334 $2,200 Not Implemented
SD0642 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $500 Not Implemented
SD0642 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $44,733 $141,268 Not Implemented
SD0642 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $4,384 $0 Not Implemented
SD0642 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $847 Not Implemented
SD0642 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,872 $2,290 Not Implemented
SD0642 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,066 $5,607 Not Implemented
NT0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,648 $5,609 Implemented
NT0015 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $9,915 $5,598 Not Implemented
NT0015 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,242 $1,258 Implemented
NT0015 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,030 $2,800 Not Implemented
NT0015 # 05 Y:2023 05 2023 CONTRACT A WOOD PALLET RECYCLING COMPANY $349 $0 Implemented
NT0015 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,401 $0 Implemented
UW2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,949 $4,760 Not Implemented
UW2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $890 $1,114 Not Implemented
UW2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,679 $0 Not Implemented
UW2302 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $439 $0 Not Implemented
LT8374 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,966 $9,823 n/a
LT8374 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $96 $350 n/a
LT8374 # 03 Y:2023 03 2023 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,878 $16,400 n/a
LT8374 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $24,154 $0 n/a
UL2213 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,500 $0 Not Implemented
UL2213 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $562 Implemented