IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0070 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $854 Implemented
NL0070 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $675 $3,315 Implemented
NL0070 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,590 $23,500 Implemented
NL0070 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,030 $4,945 Not Implemented
NL0070 # 04 Y:2022 04 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,619 $1,180 Not Implemented
NL0070 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,148 $35 Implemented
NL0070 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $32,832 $16,500 Implemented
NL0070 # 01 Y:2022 01 2022 USE RADIANT HEATER FOR SPOT HEATING $41,224 $20,136 Not Implemented
IA0512 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $277 $200 Implemented
IA0512 # 07 Y:2013 07 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,286 $135,000 Not Implemented
IA0512 # 05 Y:2013 05 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $504 $530 Not Implemented
IA0512 # 04 Y:2013 04 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $629 $890 Not Implemented
IA0512 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,424 $70 Implemented
IA0512 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,848 $100 Implemented
IA0512 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,448 $356 Implemented
IA0490 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,645 $19,693 Implemented
IA0490 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $1,440 Not Implemented
IA0490 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,416 $1,260 Implemented
IA0490 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $1,500 Implemented
IA0490 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $333 $478 Not Implemented