Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0119 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,785 | $385 | Implemented |
TA0119 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $370 | $370 | Implemented |
TA0119 # 05 Y:2006 | 05 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $60 | $0 | Implemented |
TA0119 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $14,150 | $25,000 | Implemented |
TA0119 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $480 | $0 | Implemented |
AS0422 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,736 | $9,000 | n/a |
AS0422 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,763 | $33,120 | n/a |
AS0422 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $13,918 | n/a |
AS0422 # 05 Y:2006 | 05 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,824 | $0 | n/a |
AS0422 # 01 Y:2006 | 01 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $562,419 | $119,490 | n/a |
UU0100 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,720 | $10,000 | Not Implemented |
UU0100 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,510 | $830 | Not Implemented |
UU0100 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,490 | $165 | Not Implemented |
UU0100 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $740 | Not Implemented |
UU0100 # 05 Y:2006 | 05 | 2006 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,000 | $10,000 | Not Implemented |
UU0100 # 06 Y:2006 | 06 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,280 | $4,140 | Not Implemented |
TA0113 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $540 | $370 | Not Implemented |
TA0113 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,045 | $24,738 | Implemented |
TA0113 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $232 | $340 | Not Implemented |
TA0113 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $12,153 | $1,123 | Not Implemented |
TA0113 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $12,697 | $25,000 | Implemented |
BD0297 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $455 | $600 | Implemented |
BD0297 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $688 | $0 | Implemented |
BD0297 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $812 | $1,625 | Implemented |
BD0297 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $823 | $2,975 | Implemented |