IAC logo
IAC Assessment: BD0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2006
Principal Product Steel Doors and Frames
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 130,000
Annual Production 75,000 Pieces
Production Hrs. Annual 2,340
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,690 906,228 kWh $0.04
Electricity Demand $5,556 7,553 kW-months/year $0.74
Electricity Fees $35,042 - $ -
Natural Gas $115,697 15,932 MMBtu $7.26
TOTAL ENERGY COSTS $203,375
RECOMMENDED SAVINGS* $145,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $127,209
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ Tgal
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$18,063
Cost:
$50,400
- - - - $18,063 2,488 - - - - - - - - -
-
kWh
-
-
kW-months/year
$18,063
2,488
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,422
Cost:
$1,200
$10,313 254,663 $1,109 1,500 - - - - - - - - - - $10,313
254,663
kWh
$1,109
1,500
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,740
Cost:
$2,500
- - - - $7,740 1,456 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,740
1,456
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,600
Cost:
$600
- - - - $2,600 446 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,600
446
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,324
Cost:
$6,150
$1,228 30,319 $96 131 - - - - - - - - - - $1,228
30,319
kWh
$96
131
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$823
Cost:
$2,975
$486 12,000 $17 23 - - $125 - - - $195 - - - $486
12,000
kWh
$17
23
kW-months/year
-
-
MMBtu
$125
-
$
-
-
$
$195
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$812
Cost:
$1,625
$355 8,789 $33 46 - - $231 - - - $193 - - - $355
8,789
kWh
$33
46
kW-months/year
-
-
MMBtu
$231
-
$
-
-
$
$193
-
$
-
-
Tgal
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$688
Cost:
-
$646 15,953 $42 56 - - - - - - - - - - $646
15,953
kWh
$42
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$455
Cost:
$600
$427 10,552 $28 37 - - - - - - - - - - $427
10,552
kWh
$28
37
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$422
Cost:
$600
$381 9,395 $41 56 - - - - - - - - - - $381
9,395
kWh
$41
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$235
Cost:
$140
$219 5,401 $16 21 - - - - - - - - - - $219
5,401
kWh
$16
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
12: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$42,543
Cost:
$36,180
- - - - - - - - - - - - $42,543 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$42,543
-
Tgal
13: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$58,145
Cost:
$9,400
- - - - - - - - $57,065 - $1,080 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$57,065
-
$
$1,080
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$145,272
Cost:
$112,370
$14,055 347,072 $1,382 1,870 $28,403 4,390 $356 - $57,065 - $1,468 - $42,543 - $14,055
347,072
kWh
$1,382
1,870
kW-months/year
$28,403
4,390
MMBtu
$356
-
$
$57,065
-
$
$1,468
-
$
$42,543
-
Tgal
TOTAL IMPLEMENTED Savings:
$127,209
Cost:
$61,970
$14,055 347,072 $1,382 1,870 $10,340 1,902 $356 - $57,065 - $1,468 - $42,543 - $14,055
347,072
kWh
$1,382
1,870
kW-months/year
$10,340
1,902
MMBtu
$356
-
$
$57,065
-
$
$1,468
-
$
$42,543
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption