Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0561 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,816 | $421 | Implemented |
UF0561 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $136,163 | $259,600 | Implemented |
UF0561 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,219 | $20,000 | Implemented |
UF0561 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $624 | $0 | Implemented |
UF0561 # 12 Y:2020 | 12 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $854 | $800 | Implemented |
UF0561 # 07 Y:2020 | 07 | 2020 | USE COMPRESSOR AIR FILTERS | $2,064 | $5,898 | Implemented |
UF0561 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,057 | $930 | Implemented |
UF0561 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,808 | $1,360 | Implemented |
UF0561 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,358 | $2,343 | Implemented |
UF0561 # 06 Y:2020 | 06 | 2020 | USE PHOTOCELL CONTROLS | $7,062 | $4,098 | Implemented |
UF0561 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,460 | $31,240 | Implemented |
UF0561 # 11 Y:2020 | 11 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,418 | $5,192 | Implemented |
UF0561 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $0 | Implemented |
SD0600 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $520 | Not Implemented |
SD0600 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,211 | $2,620 | Implemented |
SD0600 # 01 Y:2020 | 01 | 2020 | REDUCE SCRAP PRODUCTION | $80,293 | $41,423 | Not Implemented |
SD0600 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $869 | $450 | Implemented |
MZ0301 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,146 | $7,360 | Not Implemented |
MZ0301 # 05 Y:2020 | 05 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,963 | $4,300 | Not Implemented |
MZ0301 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $5,000 | Implemented |
MZ0301 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,820 | $7,000 | Implemented |
MZ0301 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,114 | $4,500 | Implemented |
MZ0301 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $673 | $405 | Implemented |
MZ0301 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,307 | $4,100 | Implemented |
MZ0301 # 11 Y:2020 | 11 | 2020 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,720 | Not Implemented |