IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

427

matching recommendations
Reset
NAICS 332321 Metal Window and Door Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0951 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $9,097 $34,730 Not Implemented
GT0951 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,162 $4,561 Implemented
GT0951 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $21,155 $29,319 Not Implemented
GT0951 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,280 $66,564 Implemented
GT0951 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,307 $2,255 Implemented
GT0951 # 03 Y:2020 03 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $18,092 $2,000 Not Implemented
GT0951 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $79,957 $675 Implemented
SD0596 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,809 $30,150 Not Implemented
SD0596 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,628 $300 Not Implemented
SD0596 # 03 Y:2020 03 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,037 $2,560 Not Implemented
SD0596 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,711 $0 Not Implemented
GT0917 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $20,126 $10,000 Not Implemented
GT0917 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,834 $10,400 Implemented
GT0917 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,029 $18,819 Not Implemented
GT0917 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $311 $912 Not Implemented
GT0917 # 05 Y:2018 05 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $16,833 $137,000 Not Implemented
SD0568 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $2,000 Implemented
SD0568 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,096 $0 Implemented
SD0568 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $3,292 Implemented
SD0568 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $659 $2,850 Not Implemented
SD0568 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $475 $2,150 Not Implemented
LE0448 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $2,899 $25 Implemented
LE0448 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $25 Implemented
LE0448 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,206 $20,625 Not Implemented
LE0448 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,228 $19,000 Not Implemented