Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsNAICS | 332321 | Metal Window and Door Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0174 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,694 | $2,000 | Implemented |
MI0174 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,544 | $40 | Implemented |
MI0174 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,041 | $1,210 | Implemented |
MI0174 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,087 | $13,200 | Not Implemented |
MI0174 # 06 Y:2008 | 06 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,075 | $322 | Implemented |
MI0174 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $214,998 | $360,000 | Not Implemented |
OK0768 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,145 | $16,980 | Not Implemented |
OK0768 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,626 | $749 | Not Implemented |
OK0768 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $2,027 | Not Implemented |
OK0768 # 08 Y:2008 | 08 | 2008 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $12,550 | $152,330 | Not Implemented |
OK0768 # 09 Y:2008 | 09 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,400 | $7,484 | Not Implemented |
OK0768 # 11 Y:2008 | 11 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,897 | $1,517 | Not Implemented |
OK0768 # 12 Y:2008 | 12 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,034 | $129,640 | Implemented |
OK0768 # 13 Y:2008 | 13 | 2008 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,952 | $64,800 | Implemented |
OK0768 # 14 Y:2008 | 14 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,760 | $7,525 | Implemented |
OK0768 # 15 Y:2008 | 15 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $131,460 | $41,080 | Implemented |
OK0768 # 16 Y:2008 | 16 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,790 | $36,060 | Not Implemented |
OK0768 # 17 Y:2008 | 17 | 2008 | TREAT AND REUSE RINSE WATERS | $139,194 | $135,000 | Not Implemented |
OK0768 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $208 | $1,615 | Not Implemented |
OK0768 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,704 | $17,980 | Implemented |
OK0768 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,022 | $4,452 | Not Implemented |
OK0768 # 01 Y:2008 | 01 | 2008 | USE PHOTOCELL CONTROLS | $959 | $398 | Not Implemented |
OK0768 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $441 | $2,703 | Not Implemented |
MS0331 # 03 Y:2008 | 03 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $23,107 | $0 | Not Implemented |
MS0331 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $91,249 | $79,567 | Not Implemented |