IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
NAICS 332322 Sheet Metal Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0610 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,425 $14,300 Implemented
SD0610 # 01 Y:2021 01 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,223 $1,000 Not Implemented
SF0571 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $21,900 $0 Not Implemented
SF0571 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $62 Not Implemented
SF0571 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,676 $0 Implemented
SF0571 # 04 Y:2021 04 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,159 $6,120 Not Implemented
SF0571 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,182 $2,146 Implemented
SF0571 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,069 $64,391 Implemented
SF0571 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,241 $10,932 Implemented
SD0600 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $520 Not Implemented
SD0600 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $869 $450 Implemented
SD0600 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,211 $2,620 Implemented
SD0600 # 01 Y:2020 01 2020 REDUCE SCRAP PRODUCTION $80,293 $41,423 Not Implemented
SD0488 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,081 $14,125 Not Implemented
SD0488 # 01 Y:2014 01 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,838 $7,262 Not Implemented
SD0488 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,362 $2,700 Implemented
SD0488 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,145 Not Implemented
SD0488 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,278 $3,660 Not Implemented
SD0488 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,681 $6,350 Implemented
SD0443 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,415 $800 Implemented
SD0443 # 04 Y:2012 04 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,443 $618 Implemented
SD0443 # 03 Y:2012 03 2012 ADD AREA LIGHTING SWITCHES $420 $115 Implemented
SD0443 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,935 $2,500 Implemented
SD0443 # 07 Y:2012 07 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,010 $2,500 Implemented
SD0443 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $100 Implemented