IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 332322 Sheet Metal Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $454 $1,300 Not Implemented
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $102,120 $52,500 Not Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,070 $3,000 Not Implemented
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
LE0426 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,376 $16,500 Not Implemented
WM0091 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,746 $1,275 Not Implemented
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0091 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $8,777 $30,000 Not Implemented
WM0091 # 04 Y:2016 04 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,722 $0 Not Implemented
WM0091 # 01 Y:2016 01 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,568 $2,860 Not Implemented
WM0091 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,795 $1,501 Not Implemented
WM0091 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $1,383 $560 Not Implemented
UD0945 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,063 $8,000 Implemented
UD0945 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $527 $0 Implemented
UD0945 # 14 Y:2016 14 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $756 $300 Not Implemented
UD0945 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,976 $0 Implemented
UD0945 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,904 $23,828 Not Implemented
UD0945 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,610 $0 Not Implemented
UD0945 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,486 $8,972 Not Implemented