IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

492

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0214 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $2,250 Implemented
WM0214 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,508 $0 Implemented
WM0214 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $1,500 Implemented
WM0210 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,410 $7,096 Implemented
WM0210 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,808 $1,400 Implemented
IC0293 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $1,110 Implemented
IC0293 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $6,391 Implemented
IC0293 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $384 $338 Implemented
IC0293 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $17,140 $38,685 Implemented
IC0293 # 08 Y:2024 08 2024 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,219 $3,519 Implemented
AS0564 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29 $79 Implemented
AS0564 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,294 $1,654 Implemented
AS0564 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,752 $63 Implemented
AS0564 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $143 Implemented
LS2316 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,894 $135 Implemented
LS2316 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,726 $4,515 Implemented
LS2316 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $460 $753 Implemented
SF0607 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $41,060 $346,427 Implemented
SF0607 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,524 $11,610 Implemented
SF0607 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,168 $0 Implemented
SF0607 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,963 $344 Implemented
SF0607 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,399 $8,086 Implemented
UD1059 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,386 $1,200 Implemented
UD1059 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,047 $800 Implemented
UD1059 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,663 $1,000 Implemented