Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0564 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,388 | $182,064 | Not Implemented |
AS0564 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,294 | $1,654 | Implemented |
AS0564 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,752 | $63 | Implemented |
AS0564 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,251 | $143 | Implemented |
AS0564 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $945 | $110 | Not Implemented |
AS0564 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $463 | $71 | Not Implemented |
AS0564 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29 | $79 | Implemented |
AS0423 # 01 Y:2006 | 01 | 2006 | CONDENSE OPERATION INTO ONE BUILDING | $205,767 | $2,100,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |