Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0549 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,236 | $2,600 | Implemented |
LE0549 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $251 | $1,200 | Implemented |
LE0549 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,466 | $8,000 | Implemented |
LE0549 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,374 | $56,502 | Implemented |
LE0549 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,405 | $420,000 | Not Implemented |
DL0197 # 02 Y:2021 | 02 | 2021 | ADD AREA LIGHTING SWITCHES | $21,520 | $846 | Not Implemented |
DL0197 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM TEMPERATURE | $8,560 | $0 | Not Implemented |
DL0197 # 11 Y:2021 | 11 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,320 | $14,125 | Not Implemented |
DL0197 # 10 Y:2021 | 10 | 2021 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,950 | $9,070 | Not Implemented |
DL0197 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,313 | $39,529 | Implemented |
DL0197 # 08 Y:2021 | 08 | 2021 | REPLACE BOILER | $8,560 | $23,609 | Not Implemented |
DL0197 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $1,098 | Not Implemented |
DL0197 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,960 | $173,544 | Implemented |
DL0197 # 05 Y:2021 | 05 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,034 | $1,300 | Implemented |
DL0197 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $730 | $135 | Implemented |
DL0197 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,710 | $0 | Implemented |
LE0489 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,609 | $10,500 | Not Implemented |
LE0489 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,899 | $7,200 | Not Implemented |
LE0489 # 07 Y:2020 | 07 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $9,314 | $30,000 | Implemented |
LE0489 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,668 | $21,820 | Implemented |
LE0489 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,400 | $12,000 | Implemented |
LE0489 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,208 | $8,000 | Not Implemented |
LE0489 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,293 | $12,000 | Not Implemented |
LE0489 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $3,081 | $48 | Not Implemented |
LE0369 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,258 | $7,350 | Implemented |