IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0415 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $1,697 $1,500 Not Implemented
UM0415 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,600 $1,000 Implemented
UM0415 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,832 $10,965 Not Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented
UM0415 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $822 $875 Implemented
UM0415 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,072 $4,000 Not Implemented
UA3020 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $1,775 $2,010 Implemented
UA3020 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,260 $1,155 Not Implemented
UA3020 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,967 $800 Not Implemented
UA3020 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,818 $879 Not Implemented
UA3020 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,898 $9,195 Implemented
UA3020 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $35,953 $25,000 Not Implemented
OK0830 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $152 $1,744 Not Implemented
OK0830 # 11 Y:2012 11 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,434 $1,170 Implemented
OK0830 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $1,870 $378 Implemented
OK0830 # 09 Y:2012 09 2012 INSTALL SET-BACK TIMERS $1,626 $2,310 Not Implemented
OK0830 # 08 Y:2012 08 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,673 $4,950 Not Implemented
OK0830 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,847 $19,241 Not Implemented
OK0830 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $565 $1,540 Implemented
OK0830 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,339 $1,378 Not Implemented
OK0830 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $470 Implemented
OK0830 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,068 $8,256 Implemented
OK0830 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,255 $1,300 Implemented
DL0086 # 03 Y:2012 03 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,390 $280 Not Implemented
DL0086 # 02 Y:2012 02 2012 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,479 $500 Implemented