Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 33241 | Power Boiler and Heat Exchanger Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0255 # 04 Y:2007 | 04 | 2007 | USE SYNTHETIC LUBRICANT | $336 | $0 | Not Implemented |
SU0255 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,293 | $1,300 | Implemented |
SU0255 # 06 Y:2007 | 06 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,489 | $4,993 | Not Implemented |
SU0255 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $237 | Not Implemented |
SU0255 # 08 Y:2007 | 08 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $14,202 | $19,571 | Not Implemented |
SU0255 # 09 Y:2007 | 09 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,084 | $5,590 | Not Implemented |
SU0255 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,025 | $32,224 | Not Implemented |
SU0255 # 11 Y:2007 | 11 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $269 | $727 | Not Implemented |
SU0255 # 12 Y:2007 | 12 | 2007 | OPTIMIZE PLANT POWER FACTOR | $563 | $3,344 | Not Implemented |
MZ0004 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,138 | $2,230 | Implemented |
MZ0004 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,457 | $3,412 | Not Implemented |
MZ0004 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,707 | $1,300 | Not Implemented |
MZ0004 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $184 | $150 | Implemented |
MZ0004 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,950 | $24,700 | Not Implemented |
MZ0004 # 06 Y:2007 | 06 | 2007 | DISCONNECT BALLASTS | $19,720 | $1,050 | Not Implemented |
MZ0004 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $6,900 | $2,950 | Not Implemented |
MZ0004 # 08 Y:2007 | 08 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $56,125 | $0 | Not Implemented |
MZ0004 # 09 Y:2007 | 09 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,600 | $0 | Implemented |
SU0230 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,527 | $0 | Implemented |
SU0230 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,958 | $0 | Implemented |
SU0230 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $6,237 | $0 | Implemented |
SU0230 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,565 | $0 | Implemented |
SU0230 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,565 | $1,608 | Implemented |
SU0230 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,359 | $27,000 | Implemented |
SU0230 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,657 | $1,484 | Implemented |