IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 33241 Power Boiler and Heat Exchanger Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0262 # 08 Y:2019 08 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,104 $8,000 Not Implemented
MZ0262 # 07 Y:2019 07 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,233 $65,000 Not Implemented
MZ0262 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,156 $21,621 Not Implemented
MZ0262 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $850 $0 Not Implemented
MZ0262 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,400 $0 Not Implemented
MZ0262 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $1,820 Not Implemented
MZ0262 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $3,589 $1,350 Implemented
MZ0262 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,670 $37,061 Implemented
MZ0004 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,600 $0 Implemented
MZ0004 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,138 $2,230 Implemented
MZ0004 # 08 Y:2007 08 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $56,125 $0 Not Implemented
MZ0004 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $6,900 $2,950 Not Implemented
MZ0004 # 06 Y:2007 06 2007 DISCONNECT BALLASTS $19,720 $1,050 Not Implemented
MZ0004 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,950 $24,700 Not Implemented
MZ0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $150 Implemented
MZ0004 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,707 $1,300 Not Implemented
MZ0004 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $18,457 $3,412 Not Implemented