IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 332410 Power Boiler and Heat Exchanger Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0860 # 10 Y:2013 10 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,580 $12,694 Not Implemented
OK0860 # 03 Y:2013 03 2013 USE RADIANT HEATER FOR SPOT HEATING $3,126 $26,250 Not Implemented
OK0860 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,823 $5,100 Not Implemented
OK0860 # 01 Y:2013 01 2013 INSTALL SET-BACK TIMERS $3,227 $1,723 Not Implemented
OK0860 # 12 Y:2013 12 2013 INSTALL OCCUPANCY SENSORS $445 $3,675 Implemented
OK0860 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,366 $14,850 Not Implemented
OK0860 # 09 Y:2013 09 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,499 $3,850 Not Implemented
OK0860 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $513 Not Implemented
OK0860 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,206 $847 Not Implemented
OK0860 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,722 $1,750 Implemented
OK0860 # 11 Y:2013 11 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,972 $69,860 Not Implemented
OK0860 # 05 Y:2013 05 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $3,223 $3,250 Not Implemented
AM0586 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,330 $42,750 Not Implemented
AM0586 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,790 $3,000 Implemented
AM0586 # 03 Y:2010 03 2010 $19,890 $0 Not Implemented
AM0586 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $13,800 $53,380 Not Implemented
AM0586 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $13,725 $0 Implemented
AM0586 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,660 $2,040 Not Implemented
AM0586 # 07 Y:2010 07 2010 USE SYNTHETIC LUBRICANT $2,195 $0 Not Implemented
AM0586 # 08 Y:2010 08 2010 USE PHOTOCELL CONTROLS $1,345 $200 Not Implemented
AM0486 # 03 Y:2005 03 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $710 $290 Implemented
AM0486 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $702 $0 Implemented
AM0486 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $502 $400 Implemented
AM0486 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $307 Implemented
AM0486 # 07 Y:2005 07 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $175 $700 Implemented