IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0509 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $553 $634 Implemented
WV0509 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $599 $182 Implemented
WV0509 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,057 $4,884 Implemented
WV0509 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $2,835 $885 Implemented
WV0509 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,146 $3,449 Implemented
WV0509 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,021 $1,000 Implemented
WV0480 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,543 $3,291 Implemented
WV0480 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $783 $396 Implemented
WV0480 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $934 $1,078 Implemented
WV0480 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,088 $500 Implemented
WV0480 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,967 $1,000 Implemented
WV0480 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $11,662 Implemented
WV0359 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,126 $26,364 Implemented
WV0359 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $538 $131 Implemented
WV0359 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,313 $850 Implemented
WV0359 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $0 Implemented
WV0359 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,840 $2,123 Implemented
WV0359 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,874 $300 Implemented
WV0359 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $5,087 $1,973 Implemented
WV0359 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,306 $18,395 Implemented
WV0359 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,479 $550 Implemented
WV0359 # 03 Y:2007 03 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,631 $3,500 Implemented