Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
682
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0830 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $152 | $1,744 | Not Implemented |
OK0830 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $470 | Implemented |
OK0830 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $565 | $1,540 | Implemented |
OK0830 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,339 | $1,378 | Not Implemented |
OK0830 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,255 | $1,300 | Implemented |
OK0830 # 10 Y:2012 | 10 | 2012 | INSTALL SET-BACK TIMERS | $1,870 | $378 | Implemented |
OK0830 # 11 Y:2012 | 11 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,434 | $1,170 | Implemented |
DL0086 # 01 Y:2012 | 01 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $6,400 | $100 | Implemented |
DL0086 # 02 Y:2012 | 02 | 2012 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $2,479 | $500 | Implemented |
DL0086 # 03 Y:2012 | 03 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,390 | $280 | Not Implemented |
DL0086 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,790 | $100 | Not Implemented |
DL0086 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $160 | Implemented |
DL0086 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,740 | $3,250 | Implemented |
DL0086 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,250 | $9,900 | Not Implemented |
DL0086 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,500 | $4,000 | Implemented |
DL0086 # 09 Y:2012 | 09 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,857 | $2,500 | Not Implemented |
DL0086 # 10 Y:2012 | 10 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $466 | $3,100 | Not Implemented |
DL0086 # 11 Y:2012 | 11 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $493 | $450 | Not Implemented |
DL0086 # 12 Y:2012 | 12 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,850 | $10,000 | Not Implemented |
DL0086 # 13 Y:2012 | 13 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,800 | $9,700 | Not Implemented |
DL0086 # 14 Y:2012 | 14 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,250 | $300 | Not Implemented |
MA0679 # 01 Y:2011 | 01 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $70,691 | $20,000 | Implemented |
MA0679 # 02 Y:2011 | 02 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $45,173 | $20,100 | Implemented |
MA0679 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,174 | $55,000 | Implemented |
MA0679 # 04 Y:2011 | 04 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,015 | $30,000 | Implemented |