IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0282 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,083 $1,760 Implemented
LE0282 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,314 $800 Not Implemented
LE0282 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,908 $3,000 Not Implemented
LE0282 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,538 $60,000 Implemented
LE0282 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $490 $450 Not Implemented
NC0386 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,742 $49,000 Not Implemented
NC0386 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,160 $0 Not Implemented
NC0386 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $9,621 $3,300 Not Implemented
NC0386 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,236 $100 Not Implemented
NC0386 # 05 Y:2009 05 2009 DEVELOP A REPAIR/REPLACE POLICY $2,916 $2,848 Not Implemented
NC0386 # 06 Y:2009 06 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,520 $0 Not Implemented
NC0386 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,493 $6,490 Not Implemented
NC0386 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,405 $32,776 Not Implemented
NC0386 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $6,974 $8,400 Not Implemented
UD0788 # 01 Y:2008 01 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $49,954 $12,500 Implemented
UD0788 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $26,537 $21,250 Implemented
UD0788 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $44,342 $0 Not Implemented
UD0788 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $0 Implemented
UD0788 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,385 $440 Implemented
UD0788 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,084 $0 Not Implemented
UD0788 # 06 Y:2008 06 2008 AIR CONDITION ONLY SPACE NECESSARY $13,860 $0 Implemented
UD0788 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $2,123 $3,500 Implemented
UD0788 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,134 $7,000 Not Implemented
UD0788 # 09 Y:2008 09 2008 UPGRADE CONTROLS ON COMPRESSORS $1,037 $200 Implemented
UD0788 # 10 Y:2008 10 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $590 $0 Implemented