Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
682
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0622 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,433 | $730 | n/a |
SF0622 # 06 Y:2024 | 06 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,276 | $95,533 | n/a |
NT0022 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $237 | $0 | n/a |
NT0022 # 04 Y:2024 | 04 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $20,667 | $46,524 | n/a |
NT0022 # 03 Y:2024 | 03 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $51,120 | $0 | n/a |
NT0022 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,667 | $0 | n/a |
NT0022 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,989 | $2,640 | n/a |
WM0214 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,590 | $2,250 | Implemented |
WM0214 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,388 | $6,030 | Not Implemented |
WM0214 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,508 | $0 | Implemented |
WM0214 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,880 | $1,500 | Implemented |
WM0210 # 09 Y:2024 | 09 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $277 | $0 | Not Implemented |
WM0210 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $12,043 | $21,250 | Not Implemented |
WM0210 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,808 | $1,400 | Implemented |
WM0210 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,041 | $278 | Not Implemented |
WM0210 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,410 | $7,096 | Implemented |
WM0210 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,452 | $0 | Not Implemented |
WM0210 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,116 | $0 | Not Implemented |
WM0210 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $566 | $1,050 | Not Implemented |
WM0210 # 08 Y:2024 | 08 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $564 | $1,417 | Not Implemented |
CC0030 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $219 | $868 | n/a |
CC0030 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $22,872 | $0 | n/a |
CC0030 # 06 Y:2023 | 06 | 2023 | REPLACE BOILER | $7,589 | $100,666 | n/a |
CC0030 # 05 Y:2023 | 05 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $64,875 | $571,150 | n/a |
CC0030 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $905 | $1,004 | n/a |