Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
694
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
CO0583 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $213,730 | $703,800 | Not Implemented |
CO0583 # 02 Y:2006 | 02 | 2006 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $31,500 | $1,420 | Implemented |
CO0583 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,120 | $4,920 | Implemented |
CO0583 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,990 | $200 | Implemented |
CO0583 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $480 | $165 | Implemented |
CO0583 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,970 | $37,470 | Not Implemented |
CO0583 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,400 | $9,510 | Implemented |
CO0583 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,800 | $2,380 | Implemented |
CO0583 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,450 | $18,370 | Not Implemented |
MA0591 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,080 | $82,975 | Not Implemented |
MA0591 # 02 Y:2006 | 02 | 2006 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $20,245 | $77,830 | Not Implemented |
MA0591 # 03 Y:2006 | 03 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,565 | $37,830 | Implemented |
MA0591 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,411 | $1,650 | Implemented |
MA0591 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $5,675 | $1,820 | Implemented |
MA0591 # 06 Y:2006 | 06 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,143 | $12,500 | Implemented |
MA0591 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $2,354 | $5,390 | Implemented |
MA0591 # 08 Y:2006 | 08 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,780 | $5,264 | Implemented |
MA0591 # 09 Y:2006 | 09 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,152 | $260 | Not Implemented |
AM0499 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,800 | $27,700 | Implemented |
AM0499 # 02 Y:2005 | 02 | 2005 | REUSE RAGS UNTIL COMPLETELY SOILED | $12,000 | $0 | Implemented |