Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0089 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45,060 | $540 | Implemented |
TA0089 # 01 Y:2004 | 01 | 2004 | MOVE BOILER TO MORE EFFICIENT LOCATION | $87,420 | $4,860 | Implemented |
TA0089 # 05 Y:2004 | 05 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,740 | $0 | Implemented |
TA0089 # 04 Y:2004 | 04 | 2004 | USE MINIMUM SAFE OVEN VENTILATION | $1,890 | $1,500 | Implemented |
TA0089 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $10,000 | $3,200 | Implemented |
UM0266 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,195 | $603 | Not Implemented |
UM0266 # 08 Y:2004 | 08 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,614 | $500 | Implemented |
UM0266 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,400 | $700 | Not Implemented |
UM0266 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,312 | $3,500 | Not Implemented |
UM0266 # 04 Y:2004 | 04 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,182 | $1,000 | Not Implemented |
UM0266 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,847 | $2,000 | Implemented |
UM0266 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,131 | $7,512 | Implemented |
UM0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $900 | Implemented |
UM0266 # 01 Y:2004 | 01 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $11,825 | $4,500 | Implemented |
UM0266 # 10 Y:2004 | 10 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $666 | $610 | Implemented |
LE0184 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,355 | $1,500 | Implemented |
LE0184 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,017 | $30,709 | Implemented |
LE0184 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,137 | $200 | Implemented |
LE0184 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,237 | $0 | Implemented |
LE0184 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $15,203 | $2,000 | Not Implemented |
LE0184 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $34,434 | $10,000 | Implemented |
LE0184 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,446 | $0 | Not Implemented |
WI0453 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,445 | $40,000 | Not Implemented |
WI0453 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,121 | $1,280 | Implemented |
WI0453 # 04 Y:2003 | 04 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,824 | $8,700 | Not Implemented |