IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

453

matching recommendations
Reset
NAICS 332431 Metal Can Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0471 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $5,415 $11,000 Implemented
WV0471 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,088 $1,000 Implemented
WV0471 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $310 Implemented
WV0471 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,543 $0 Implemented
WV0471 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,944 $3,375 Not Implemented
WV0471 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $1,731 $680 Implemented
WV0471 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,159 $4,625 Implemented
WV0471 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $716 $105 Implemented
WV0471 # 12 Y:2013 12 2013 DISCONNECT BALLASTS $297 $70 Implemented
WV0471 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $124 $426 Implemented
UA3020 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $35,953 $25,000 Not Implemented
UA3020 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,898 $9,195 Implemented
UA3020 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,967 $800 Not Implemented
UA3020 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $1,775 $2,010 Implemented
UA3020 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,260 $1,155 Not Implemented
UA3020 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,818 $879 Not Implemented
DL0086 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $6,400 $100 Implemented
DL0086 # 02 Y:2012 02 2012 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,479 $500 Implemented
DL0086 # 03 Y:2012 03 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,390 $280 Not Implemented
DL0086 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $100 Not Implemented
DL0086 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $160 Implemented
DL0086 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,740 $3,250 Implemented
DL0086 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $9,900 Not Implemented
DL0086 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $4,000 Implemented
DL0086 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,857 $2,500 Not Implemented