IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
NAICS 3325 Hardware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0032 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $0 Implemented
MZ0032 # 04 Y:2008 04 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $757 $300 Implemented
UM0280 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,334 $24,499 Not Implemented
UM0280 # 02 Y:2005 02 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,174 $11,550 Not Implemented
UM0280 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,277 $35 Implemented
UM0280 # 04 Y:2005 04 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,274 $1,680 Not Implemented
UM0280 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $2,086 $128 Implemented
UM0280 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,470 $484 Implemented
UM0280 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $750 Implemented
UM0280 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $654 $225 Implemented
UM0280 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $397 $1,000 Not Implemented
UM0280 # 10 Y:2005 10 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $208 $105 Not Implemented
GT0784 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,866 $1,000 Implemented
GT0784 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $1,782 Not Implemented
GT0784 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,500 $1,200 Implemented
GT0784 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $14,255 $35,020 Not Implemented
GT0784 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $51,264 $0 Not Implemented
GT0784 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $40,320 $5,000 Not Implemented
GT0784 # 07 Y:2004 07 2004 MINIMIZE WATER USAGE $7,400 $1,840 Implemented
GT0784 # 08 Y:2004 08 2004 METER WASTE WATER $4,010 $1,100 Implemented
GT0784 # 09 Y:2004 09 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,685 $4,550 Not Implemented
GT0784 # 10 Y:2004 10 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $14,204 $29,000 Not Implemented
OR0454 # 01 Y:2004 01 2004 REDESIGN PROCESS $39,560 $0 Not Implemented
OR0454 # 02 Y:2004 02 2004 $24,900 $2,600 Not Implemented
OR0454 # 03 Y:2004 03 2004 $5,720 $13,080 Implemented