IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
NAICS 332510 Hardware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0636 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,805 $300 Not Implemented
SD0636 # 02 Y:2023 02 2023 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $28,974 $0 Not Implemented
SD0636 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,227 $4,339 Not Implemented
SD0636 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,654 $4,172 Implemented
SD0636 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $111,629 $154,568 Not Implemented
SD0636 # 06 Y:2023 06 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,771 $37,377 Not Implemented
SD0636 # 07 Y:2023 07 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $473 $0 Not Implemented
SD0636 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,560 $30,577 Not Implemented
SD0636 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $72,872 $0 Not Implemented
SD0547 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,853 $20,582 Implemented
SD0547 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $3,679 $11,568 Implemented
SD0547 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,165 $1,500 Implemented
SD0547 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,746 $2,045 Not Implemented
SD0547 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $1,326 $750 Implemented
SD0547 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $725 $914 Not Implemented
SD0547 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $689 $567 Implemented