IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 332510 Hardware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0123 # 02 Y:2022 02 2022 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,422 $4,000 n/a
CW0123 # 03 Y:2022 03 2022 REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS $30,091 $55,770 n/a
CW0123 # 04 Y:2022 04 2022 IMPROVE LUBRICATION PRACTICES $27,999 $8,008 n/a
CW0123 # 05 Y:2022 05 2022 USE OPTIMUM TEMPERATURE $4,521 $3,500 n/a
CW0123 # 06 Y:2022 06 2022 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $2,357 $0 n/a
CW0123 # 07 Y:2022 07 2022 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $30,793 $45,000 n/a
CW0123 # 08 Y:2022 08 2022 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $7,698 $5,000 n/a
CW0123 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $12,694 n/a
CW0123 # 10 Y:2022 10 2022 USE POWER DURING OFF-PEAK PERIODS $1,949 $0 n/a
CW0123 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $105 n/a
DL0182 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,320 $1,000 Not Implemented
DL0182 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,845 $1,900 Not Implemented
DL0182 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $879 Implemented
DL0182 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $349 $1,440 Not Implemented
DL0182 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,140 $2,150 Not Implemented
DL0182 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,920 $60 Not Implemented
DL0182 # 03 Y:2020 03 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,280 $9,306 Not Implemented
DL0182 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,900 $25,200 Implemented
DL0182 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,910 $0 Implemented
DL0182 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $290 $0 Not Implemented
WV0492 # 12 Y:2014 12 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $185 $700 Implemented
WV0492 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $482 $356 Implemented
WV0492 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $1,916 Implemented
WV0492 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $811 $30 Not Implemented
WV0492 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,697 $338 Implemented