IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3326 Spring and Wire Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0221 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,683 $0 Implemented
DL0221 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,723 $0 Implemented
DL0221 # 16 Y:2023 16 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,688 $4,615 Implemented
DL0221 # 14 Y:2023 14 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,645 $500 Implemented
DL0221 # 13 Y:2023 13 2023 REPAIR AND ELIMINATE STEAM LEAKS $53,076 $20,000 Implemented
DL0221 # 12 Y:2023 12 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,218 $1,080 Implemented
DL0221 # 11 Y:2023 11 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $812 $2,301 Implemented
DL0221 # 09 Y:2023 09 2023 AIR CONDITION ONLY SPACE NECESSARY $2,678 $610 Implemented
DL0221 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $500 Implemented
DL0221 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $293 $0 Implemented
DL0221 # 04 Y:2023 04 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $781 $0 Implemented
LE0413 # 07 Y:2016 07 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,462 $25,000 Implemented
LE0413 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,404 $15,000 Implemented
LE0413 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $482 $590 Implemented
LE0413 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,000 Implemented
LE0413 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,494 $725 Implemented
LE0413 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,124 $500 Implemented
LE0381 # 05 Y:2014 05 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,233 $771 Implemented
LE0381 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,665 $3,500 Implemented
LE0381 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $6,567 $9,190 Implemented
LE0381 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,880 $36 Implemented
LE0212 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,712 $200 Implemented
LE0212 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,055 $350 Implemented
LE0212 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,111 $1,500 Implemented
LE0212 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $6,490 $1,925 Implemented