IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
NAICS 33261 Spring and Wire Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0900 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $19,139 $30,070 n/a
AM0900 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,923 $10,333 n/a
AM0900 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,283 $273 n/a
AM0900 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,024 $546 n/a
AM0900 # 05 Y:2024 05 2024 USE SYNTHETIC LUBRICANT $727 $546 n/a
AM0900 # 06 Y:2024 06 2024 RECOVER WASTE HEAT FROM EQUIPMENT $29,310 $69,700 n/a
AM0852 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $89 $91 Not Implemented
AM0852 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $49,000 $68,400 Implemented
AM0852 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $4,070 $540 Not Implemented
AM0852 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $220 $385 Not Implemented
AM0852 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,500 Implemented
AM0852 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,040 $1,835 Implemented
AM0852 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,170 $35 Not Implemented
AM0852 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,265 $0 Not Implemented
AM0852 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $420 $235 Implemented
AM0840 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $360 $260 Not Implemented
AM0840 # 09 Y:2022 09 2022 USE PHOTOCELL CONTROLS $170 $50 Not Implemented
AM0840 # 10 Y:2022 10 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $86 $179 Implemented
AM0840 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $20,260 $33,400 Not Implemented
AM0840 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,045 $17,675 Implemented
AM0840 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $1,000 Implemented
AM0840 # 04 Y:2022 04 2022 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,480 $1,710 Not Implemented
AM0840 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,310 $750 Not Implemented
AM0840 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $50 Implemented
AM0840 # 07 Y:2022 07 2022 USE SYNTHETIC LUBRICANT $665 $450 Not Implemented