IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 332613 Spring Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0060 # 01 Y:2015 01 2015 REPLACE BOILER $24,302 $20,000 Not Implemented
WM0060 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,761 $2,291 Implemented
WM0060 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,080 $110 Implemented
WM0060 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,355 $0 Implemented
WM0060 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $680 $255 Implemented
WM0060 # 04 Y:2015 04 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,701 $1,218 Implemented
WM0060 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $786 $3,000 Implemented
IC0178 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $843 $0 Not Implemented
IC0178 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,701 $2,530 Not Implemented
IC0178 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $0 Implemented
IC0178 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,949 $6,377 Not Implemented
IC0178 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $754 $4,000 Implemented
IC0178 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,180 $3,286 Implemented
IC0178 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $694 $0 Not Implemented
IC0178 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,221 $14,399 Implemented
IC0178 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,297 $244 Not Implemented
IC0178 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,171 $709 Not Implemented
IC0142 # 14 Y:2008 14 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,835 $16,294 Not Implemented
IC0142 # 13 Y:2008 13 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,171 $0 Implemented
IC0142 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $711 $1,402 Implemented
IC0142 # 11 Y:2008 11 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $5,429 Implemented
IC0142 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $203 Implemented
IC0142 # 06 Y:2008 06 2008 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,442 $0 Implemented
IC0142 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $1,150 Implemented
IC0142 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $697 $90 Not Implemented