Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,207
matching recommendationsNAICS | 3327 | Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2510 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $71,181 | $417,175 | n/a |
UL2510 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $1,506 | $185 | n/a |
UL2510 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,413 | $9,750 | n/a |
UL2510 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,769 | $3,240 | n/a |
UU0275 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,066 | $2,066 | n/a |
UU0275 # 02 Y:2025 | 02 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $33,900 | $8,025 | n/a |
UU0275 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $12,307 | $10,880 | n/a |
UU0275 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $15,960 | n/a |
UU0275 # 03 Y:2025 | 03 | 2025 | USE AUTOMATIC FLOW CONTROL | $1,516 | $5,258 | n/a |
UU0275 # 06 Y:2025 | 06 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $4,820 | $8,740 | n/a |
SD0678 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $947 | $3,752 | n/a |
SD0678 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,339 | $25,895 | n/a |
SD0678 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $156 | $424 | n/a |
SD0678 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,843 | $23,800 | n/a |
SD0678 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $843 | $2,979 | n/a |
SD0678 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $50,863 | $545,300 | n/a |
SD0678 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,200 | $3,396 | n/a |
IP0212 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $914 | $593 | n/a |
IP0212 # 05 Y:2025 | 05 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $9,826 | $39,500 | n/a |
IP0212 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $35,687 | $360 | n/a |
IP0212 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,292 | $84,000 | n/a |
IP0212 # 01 Y:2025 | 01 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,010 | $0 | n/a |
NT0043 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,389 | $0 | n/a |
NT0043 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,473 | $5,609 | n/a |
NT0043 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,674 | $31,572 | n/a |