IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,135

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0222 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,097 $3,000 Not Implemented
DL0222 # 07 Y:2023 07 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,366 $25,000 Implemented
DL0222 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,152 $4,581 Not Implemented
DL0222 # 09 Y:2023 09 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,888 $2,450 Not Implemented
CC0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $400 n/a
CC0015 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,040 $7,085 n/a
CC0015 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $2,000 n/a
CC0015 # 04 Y:2023 04 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $199 $360 n/a
UC2303 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $284 $500 Not Implemented
UC2303 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $115 $696 Not Implemented
UC2303 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $2,800 Not Implemented
UC2303 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,129 $500 Not Implemented
UC2303 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $16,066 $176,604 Not Implemented
UC2303 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,257 $36,220 Not Implemented
UC2303 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,312 $455,896 Not Implemented
UC2303 # 08 Y:2023 08 2023 USE HEAT PUMP FOR SPACE CONDITIONING $3,229 $13,224 Not Implemented
UC2303 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $11,455 $55,867 Not Implemented
SJ0001 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $58,845 $236,368 Not Implemented
SJ0001 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,201 $0 Not Implemented
SJ0001 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,541 $0 Not Implemented
SJ0001 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $480 $0 Not Implemented
SJ0001 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,785 $1,200 Not Implemented
LT8365 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,577 $1,300 n/a
LT8365 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $55,888 $0 n/a
LT8365 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,434 $216,000 n/a