Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,135
matching recommendationsNAICS | 3327 | Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0222 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,097 | $3,000 | Not Implemented |
DL0222 # 07 Y:2023 | 07 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,366 | $25,000 | Implemented |
DL0222 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,152 | $4,581 | Not Implemented |
DL0222 # 09 Y:2023 | 09 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,888 | $2,450 | Not Implemented |
CC0015 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $278 | $400 | n/a |
CC0015 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,040 | $7,085 | n/a |
CC0015 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $2,000 | n/a |
CC0015 # 04 Y:2023 | 04 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $199 | $360 | n/a |
UC2303 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $284 | $500 | Not Implemented |
UC2303 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $115 | $696 | Not Implemented |
UC2303 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $870 | $2,800 | Not Implemented |
UC2303 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,129 | $500 | Not Implemented |
UC2303 # 05 Y:2023 | 05 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $16,066 | $176,604 | Not Implemented |
UC2303 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,257 | $36,220 | Not Implemented |
UC2303 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,312 | $455,896 | Not Implemented |
UC2303 # 08 Y:2023 | 08 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,229 | $13,224 | Not Implemented |
UC2303 # 09 Y:2023 | 09 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,455 | $55,867 | Not Implemented |
SJ0001 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,845 | $236,368 | Not Implemented |
SJ0001 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,201 | $0 | Not Implemented |
SJ0001 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,541 | $0 | Not Implemented |
SJ0001 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $480 | $0 | Not Implemented |
SJ0001 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,785 | $1,200 | Not Implemented |
LT8365 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,577 | $1,300 | n/a |
LT8365 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,888 | $0 | n/a |
LT8365 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,434 | $216,000 | n/a |