IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0320 # 15 Y:2025 15 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $42,252 $8,172 n/a
IC0320 # 05 Y:2025 05 2025 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $20,912 $135,826 n/a
IC0320 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $288 n/a
IC0320 # 11 Y:2025 11 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,402 $89,603 n/a
IC0320 # 13 Y:2025 13 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,293 $0 n/a
IC0320 # 10 Y:2025 10 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,014 $0 n/a
IC0320 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,890 $4,339 n/a
IC0320 # 14 Y:2025 14 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,451 $2,683 n/a
IC0320 # 08 Y:2025 08 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,028 $18,900 n/a
IC0320 # 12 Y:2025 12 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,662 $5,368 n/a
IC0320 # 03 Y:2025 03 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $373 $0 n/a
IC0320 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $101,385 $489,315 n/a
IC0320 # 06 Y:2025 06 2025 INSTALL OCCUPANCY SENSORS $3,180 $603 n/a
IC0320 # 09 Y:2025 09 2025 PURCHASE EQUIPMENT INSTEAD OF LEASING $14,144 $4,260 n/a
IC0320 # 02 Y:2025 02 2025 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $349 $768 n/a
IC0205 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $1,769 Implemented
IC0205 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $631 $50 Not Implemented
IC0205 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $30 Implemented
IC0205 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,754 $1,197 Not Implemented
IC0205 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $2,300 Not Implemented
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
IC0205 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,439 $0 Implemented
BD0460 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $2,713 $750 Not Implemented
BD0460 # 01 Y:2015 01 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,989 $2,500 Not Implemented
BD0460 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $1,240 $375 Not Implemented