IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1032 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $201 $1,049 Not Implemented
OK1032 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $417 $1,804 Implemented
OK1032 # 02 Y:2020 02 2020 USE RADIANT HEATER FOR SPOT HEATING $4,244 $3,000 Not Implemented
OK1032 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $10,720 $12,215 Not Implemented
OK0983 # 05 Y:2018 05 2018 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $395 $1,140 Not Implemented
OK0983 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $588 $4,500 Not Implemented
OK0983 # 06 Y:2018 06 2018 USE RADIANT HEATER FOR SPOT HEATING $1,816 $4,820 Not Implemented
OK0983 # 07 Y:2018 07 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,912 $205,700 Not Implemented
OK0983 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $4,410 Not Implemented
OK0983 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $1,710 Not Implemented
OK0983 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $192 $530 Not Implemented
OK0983 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $469 $1,256 Not Implemented
OK0983 # 04 Y:2018 04 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,532 $10,700 Not Implemented
OK0979 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,648 $6,600 Not Implemented
OK0979 # 08 Y:2017 08 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $758 $1,100 Not Implemented
OK0979 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,331 $1,000 Implemented
OK0979 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $798 $0 Not Implemented
OK0979 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,344 $2,184 Not Implemented
OK0979 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,621 $42,413 Not Implemented
OK0979 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,833 $2,600 Not Implemented
OK0979 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,410 $1,400 Not Implemented
OK0779 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,089 $14,467 Implemented
OK0779 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,634 $26,750 Implemented
OK0779 # 03 Y:2009 03 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0779 # 02 Y:2009 02 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122,608 $160,000 Not Implemented