Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 3327 | Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0275 # 03 Y:2025 | 03 | 2025 | USE AUTOMATIC FLOW CONTROL | $1,516 | $5,258 | n/a |
UU0275 # 02 Y:2025 | 02 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $33,900 | $8,025 | n/a |
UU0275 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $15,960 | n/a |
UU0275 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $12,307 | $10,880 | n/a |
UU0275 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,066 | $2,066 | n/a |
UU0275 # 06 Y:2025 | 06 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $4,820 | $8,740 | n/a |
SD0678 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,843 | $23,800 | n/a |
SD0678 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,200 | $3,396 | n/a |
SD0678 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,339 | $25,895 | n/a |
SD0678 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $50,863 | $545,300 | n/a |
SD0678 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $947 | $3,752 | n/a |
SD0678 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $156 | $424 | n/a |
SD0678 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $843 | $2,979 | n/a |
IP0212 # 05 Y:2025 | 05 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $9,826 | $39,500 | n/a |
IP0212 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $35,687 | $360 | n/a |
IP0212 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $914 | $593 | n/a |
IP0212 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,292 | $84,000 | n/a |
IP0212 # 01 Y:2025 | 01 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,010 | $0 | n/a |
NT0043 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,674 | $31,572 | n/a |
NT0043 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,473 | $5,609 | n/a |
NT0043 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,389 | $0 | n/a |
NT0043 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $146,777 | $515,060 | n/a |
NT0043 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $17,336 | $25,437 | n/a |
AS0608 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $107,581 | $4,250,000 | n/a |
AS0608 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,174 | $1,423 | n/a |