Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
648
matching recommendationsNAICS | 33271 | Machine Shops |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1112 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,199 | $0 | n/a |
OK1112 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,259 | $17,620 | n/a |
OK1112 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $681 | $100 | n/a |
OK1112 # 07 Y:2024 | 07 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,088 | $38,766 | n/a |
UL2314 # 09 Y:2023 | 09 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,470 | $15,600 | Not Implemented |
UL2314 # 08 Y:2023 | 08 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $2,765 | $100 | Implemented |
UL2314 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,095 | $476,338 | Not Implemented |
UL2314 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,398 | $6,825 | Not Implemented |
UL2314 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,061 | $4,320 | Implemented |
UL2314 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,358 | $0 | Not Implemented |
UL2314 # 03 Y:2023 | 03 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,576 | $15,000 | Not Implemented |
UL2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,821 | $13,461 | Not Implemented |
UL2314 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $29,804 | $13,936 | Not Implemented |
CI0024 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,490 | $159,041 | n/a |
CI0024 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,432 | $2,000 | n/a |
CI0024 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,658 | $3,828 | n/a |
CI0024 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,369 | $0 | n/a |
CI0024 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,729 | $0 | n/a |
CI0024 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,179 | $7,910 | n/a |
CI0024 # 07 Y:2023 | 07 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,423 | $15,000 | n/a |
CI0024 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,298 | $1,800 | n/a |
CI0024 # 09 Y:2023 | 09 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $1,090 | $6,000 | n/a |
SD0640 # 01 Y:2023 | 01 | 2023 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $11,699 | $6,300 | Implemented |
SD0640 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,059 | $77,697 | Implemented |
SD0640 # 03 Y:2023 | 03 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,401 | $6,200 | Implemented |