Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsNAICS | 33271 | Machine Shops |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,821 | $13,461 | Not Implemented |
UL2314 # 08 Y:2023 | 08 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $2,765 | $100 | Implemented |
UL2314 # 09 Y:2023 | 09 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,470 | $15,600 | Not Implemented |
UL2314 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,095 | $476,338 | Not Implemented |
UL2314 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,358 | $0 | Not Implemented |
UL2314 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,061 | $4,320 | Implemented |
UL2314 # 03 Y:2023 | 03 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,576 | $15,000 | Not Implemented |
UL2314 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,398 | $6,825 | Not Implemented |
UL2314 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $29,804 | $13,936 | Not Implemented |
CI0024 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,729 | $0 | n/a |
CI0024 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,179 | $7,910 | n/a |
CI0024 # 07 Y:2023 | 07 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,423 | $15,000 | n/a |
CI0024 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,298 | $1,800 | n/a |
CI0024 # 09 Y:2023 | 09 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $1,090 | $6,000 | n/a |
CI0024 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,369 | $0 | n/a |
CI0024 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,658 | $3,828 | n/a |
CI0024 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,432 | $2,000 | n/a |
CI0024 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,490 | $159,041 | n/a |
SD0640 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,059 | $77,697 | Implemented |
SD0640 # 01 Y:2023 | 01 | 2023 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $11,699 | $6,300 | Implemented |
SD0640 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,095 | $3,366 | Implemented |
SD0640 # 03 Y:2023 | 03 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,401 | $6,200 | Implemented |
SD0640 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,191 | $8,424 | Implemented |
SD0640 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $570 | Implemented |
SD0640 # 06 Y:2023 | 06 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $641 | $1,749 | Implemented |