Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
704
matching recommendationsNAICS | 332710 | Machine Shops |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1152 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,965 | $0 | n/a |
OK1152 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,701 | $9,073 | n/a |
OK1152 # 09 Y:2025 | 09 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,238 | $0 | n/a |
OK1152 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,424 | $13,000 | n/a |
OK1152 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $0 | n/a |
OK1152 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,453 | $208,600 | n/a |
OK1152 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,879 | $2,304 | n/a |
OK1152 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,737 | $16,196 | n/a |
OK1152 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,489 | $20,639 | n/a |
UL2510 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,413 | $9,750 | n/a |
UL2510 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $1,506 | $185 | n/a |
UL2510 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $71,181 | $417,175 | n/a |
UL2510 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,769 | $3,240 | n/a |
UU0275 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $15,960 | n/a |
UU0275 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,066 | $2,066 | n/a |
UU0275 # 03 Y:2025 | 03 | 2025 | USE AUTOMATIC FLOW CONTROL | $1,516 | $5,258 | n/a |
UU0275 # 02 Y:2025 | 02 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $33,900 | $8,025 | n/a |
UU0275 # 06 Y:2025 | 06 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $4,820 | $8,740 | n/a |
UU0275 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $12,307 | $10,880 | n/a |
SD0678 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,339 | $25,895 | n/a |
SD0678 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $947 | $3,752 | n/a |
SD0678 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $50,863 | $545,300 | n/a |
SD0678 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,843 | $23,800 | n/a |
SD0678 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,200 | $3,396 | n/a |
SD0678 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $156 | $424 | n/a |