IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

691

matching recommendations
Reset
NAICS 332710 Machine Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0049 # 08 Y:2024 08 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $251 $144 Not Implemented
MU0049 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $49 $0 Not Implemented
SJ0022 # 05 Y:2024 05 2024 REDUCE HEAT GAIN BY WINDOW TINTING $367 $2,139 Not Implemented
SJ0022 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,671 $0 Not Implemented
SJ0022 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $213 $179 Not Implemented
SJ0022 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,205 $0 Not Implemented
SJ0022 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $226,672 $1,340,116 Not Implemented
SJ0021 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $227,474 $847,735 Not Implemented
SJ0021 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,528 $0 Implemented
SJ0021 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,813 $12,216 Not Implemented
SJ0021 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,438 $0 Not Implemented
SJ0021 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,255 $1,308 Implemented
SJ0021 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $2,078 Implemented
SJ0021 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,040 $0 Implemented
SJ0021 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $493 $109 Implemented
OK1112 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,785 $105,814 Implemented
OK1112 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,481 $488 Not Implemented
OK1112 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,094 $626 Not Implemented
OK1112 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,199 $0 Not Implemented
OK1112 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,259 $17,620 Not Implemented
OK1112 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $681 $100 Not Implemented
OK1112 # 07 Y:2024 07 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,088 $38,766 Not Implemented
UL2314 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,470 $15,600 Not Implemented
UL2314 # 08 Y:2023 08 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,765 $100 Implemented
UL2314 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,095 $476,338 Not Implemented