IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
NAICS 332721 Precision Turned Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0235 # 06 Y:2024 06 2024 REDUCE VENTILATION AIR $1,085 $0 n/a
DL0235 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,674 $10,000 n/a
DL0235 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $646 $3,000 n/a
DL0235 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $719 $0 n/a
DL0235 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,885 $500 n/a
DL0235 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $751 $800 n/a
DL0235 # 07 Y:2024 07 2024 ADJUST VENTS TO MINIMIZE ENERGY USE $814 $1,500 n/a
TR0045 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $7,255 $126 n/a
TR0045 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $640 n/a
TR0045 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,383 $217,770 n/a
DL0222 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $413 $0 Not Implemented
DL0222 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $338 $9,500 Implemented
DL0222 # 02 Y:2023 02 2023 INSTALL SET-BACK TIMERS $245 $130 Not Implemented
DL0222 # 01 Y:2023 01 2023 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,009 $42 Not Implemented
DL0222 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $871 Not Implemented
DL0222 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,152 $4,581 Not Implemented
DL0222 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,097 $3,000 Not Implemented
DL0222 # 09 Y:2023 09 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,888 $2,450 Not Implemented
DL0222 # 07 Y:2023 07 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,366 $25,000 Implemented
SU0524 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,422 $650 Not Implemented
SU0524 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $314 $510 Not Implemented
SU0524 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $462 Not Implemented
SU0524 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,266 $0 Not Implemented
SU0524 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,837 $2,064 Not Implemented
SU0524 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,106 $875 Not Implemented